SAP QM CONSULTANT

Hammatiyat Ltd
Bihar
- PP Master Data - Material master, Bill of material, Work center, Routing, Resource, Master recipe, Production version.
- Configuration: Order type Creation, Order type dependent parameters, Confirmation Parameters, Checking Control, Scheduling parameters for production order, Production scheduling profile, control key for operations
- MRP: Planning with different planning procedures like MRP, MPS, carrying out planning run (Single-item multilevel and Single-item single level)
- Planning with Make-to-stock, Make-to-order and other strategies.
- Conceptual knowledge of Sales and Operations planning and Long -Term Planning.
- Good knowledge of Batch Management - Batch determination, Batch Derivation.
SAVE